![]() |
|
||||
| Knowledge is free for all. Please tell others about this site | |||||
|
|
|||||
|
|
|||||
|
Navigation: Multiple Predetermined Overhead Rates Definition:
A costing system in which there are multiple overhead cost pools with a
different predetermined rate for each cost pool, rather than a single
predetermined overhead rate for the entire company. Frequently, each
production department is treated as a separate overhead cost pool.
|
|||||
|
|
|||||
|
|
|||||
|
No text of this website can
be republished without permission of the owner of this site and the authors
of these managerial, management, and cost accounting articles. Otherwise
sever civil and criminal penalties shall be imposed. All rights reserved. |
|||||